Questão #14760932008

Inglês — L. interpretação de texto - reading comprehension

One frequently overlooked area in planning is technicalreviews and inspections. A technical review requires substantialpreparation on the part of the presenters. Documents must bepublished and distributed and presentation material organized andmade into slides or overheads. Practice sessions are conducted bypresenters with an audience of critics to prepare for the review.The reviewers should read the material, attend thepresentations, and write reports. On large projects with manyreviews and walk-throughs involving many participants, asubstantial number of labor hours can be consumed analyzingdocuments, attending meetings, and writing reports. For example,a system design review for one module or unit can require 150labor hours. When overlooked, this labor can result in a verylarge error in resource and schedule estimation.Many projects include risk assessment and riskmanagement as a key part of the planning process and expect theplan toidentify specific risk areas. The plan is expected toquantify both probability of failure and consequences of failureand to describe what will be done to contain development risk.A. Behforooz and F. Hudson. Software engineeringfundamentals. Ed. Oxford (adapted).Based on the text above, judge the following items.

In a lot of projects, it is hoped that the plan should be able to spot specific risky areas.